Built on WIX Headless
Commercial and industrial general contractor, Grand Rapids, MI. MI Builders License 262100253Emergency repairsVendor setup

Warehouse and distribution center renovations in Grand Rapids

A warehouse renovation has to fit around trucks, forklifts and orders that ship every day. Grand Rapids Construction builds offices and sales areas inside warehouses, replaces dock and yard concrete, coordinates the fire protection changes a new racking layout needs, and manages roof work over operations that cannot stop.

Call 616-323-0292info@grandrapidsconstruction.com

Request a free quote

Commercial and industrial projects only. A few details are enough to start.

Rather talk? Call 616-323-0292 or email info@grandrapidsconstruction.com. For project requests only; sales, marketing and SEO offers aren't answered.

Distribution center aisles with parts shelving and a yellow-railed mezzanine walkway
Genuine Parts Company distribution center, Grand Rapids
  • MI Builders License 262100253
  • Commercial and industrial work only
  • Work planned around operating facilities
  • Kent, Barry and Muskegon counties

Who renovates a warehouse or distribution center while it stays open in Grand Rapids?

A commercial general contractor that phases the work around docks, forklifts and shifts, and coordinates the fire protection, concrete and roofing trades the building needs. Grand Rapids Construction renovates warehouses and distribution centers in Grand Rapids and across West Michigan, including offices inside the warehouse, shipping yards and roofs over active operations. Start with a walk-through and a list of what has to keep moving during the work.

What this covers

  • Offices, sales areas and counters inside the warehouse
  • Break rooms, restrooms and crew areas
  • Dock, door and opening changes
  • Shipping yard and dock apron concrete
  • Interior slab repairs and replacement
  • Sprinkler changes after racking or storage changes
  • Draft curtains where the design requires them
  • Roof repairs and replacement over operations

Where our part stops. We coordinate the construction and the licensed trades and designers. We do not design or install racking, and we do not decide the fire protection requirements: the sprinkler designer, the fire marshal and the building department do.

Offices and sales areas inside the warehouse

Distribution buildings often need more front-of-house space than they were built with: a sales counter, offices for inside sales, a conference room, a break room. Building them inside a high-bay space means new walls, a ceiling, heating and cooling for the enclosed rooms, and changes to sprinkler coverage under the new ceiling. We coordinate all of it and keep the office construction separated from the warehouse floor.

For SCP Distributors' new Grand Rapids distribution center, the work included new sales offices and office areas, sprinkler modifications, fire alarm coordination and emergency lighting, plus preparing the warehouse and shipping yard for opening. At BlueLinx in Grand Rapids, office, break room and conference room renovations were built inside the facility.

Racking and storage changes affect the sprinklers

A sprinkler system is designed for a storage height, a commodity and a layout. Raise the racks, add rows, store something more combustible or close in part of the floor, and the design may no longer match. The fix can range from relocated heads to new hydraulic calculations, in-rack sprinklers, draft curtains or a review of the water supply.

Ask before the racking is ordered, not after it is installed. A licensed fire protection designer reviews the change, the fire marshal and building department decide what is required, and we coordinate the work. At Genuine Parts Company's Grand Rapids distribution facility, the sprinkler system was reconfigured after an accident while operations continued.

Docks, yards and slabs

Dock aprons and truck courts take the heaviest loads on the site. When that concrete fails, it is replaced in sections so trucks always have a route, and each area reopens when its pour is ready to carry the traffic. At BlueLinx, deteriorated shipping yard concrete was torn out and replaced across large areas while trucks kept moving.

Roof work over live operations

Replacing or repairing a warehouse roof means working above people, racking and product. The work is phased so only part of the roof is open at a time, material is staged and lifted where it does not block docks or traffic, and open areas are closed up before weather arrives. At the FedEx Ground hub in Grand Rapids, a full roof replacement was phased so the hub kept running throughout.

What helps us help you

  • A floor plan showing docks, racking and traffic routes
  • Shift times and peak shipping days
  • Current and planned storage heights, and what is stored
  • Existing sprinkler drawings, if you have them
  • Photos of the concrete, roof areas or offices to change
  • Any letter from your insurer or the fire marshal

Part of our industrial and manufacturing work.

Related projects

Work for named West Michigan clients. All projects and client reviews.

  • SCP Distributors sign in front of the company's distribution building

    Distribution center, Grand Rapids, MI

    New distribution center opening for SCP Distributors

    Preconstruction planning, engineering coordination, fire suppression and new office and sales areas for SCP's new Grand Rapids distribution center.

    "Grand Rapids Construction did an excellent job completing the sales offices for Pool Corp and assisting with preparing the warehouses and shipping yard for their Grand Rapids location."

    Brandon Skaff, Project Manager, Pool Corp
  • BlueLinx distribution building with a long covered row of loading docks and a truck in the yard

    Building products distribution, Grand Rapids, MI

    Office renovations and shipping yard concrete for BlueLinx

    Office, break room and conference room renovations inside the facility, plus tear-out and replacement of deteriorated concrete in the shipping yard.

    "When BlueLinx needed to renovate our warehouse, sales office, and shipping yard in Grand Rapids, MI, we chose Grand Rapids Construction and could not be more pleased. These guys are the real deal."

    Tyson W., Operations Manager, BlueLinx
  • FedEx Ground distribution hub at dusk with trailers lined up at the docks

    Distribution hub, Grand Rapids, MI

    Full roof replacement at the FedEx Ground Grand Rapids hub

    A full roof replacement on a large distribution hub, phased so daily operations continued without major interruptions.

  • Distribution center, Grand Rapids, MI

    Fire suppression reconfigured after facility damage at a Genuine Parts distribution center

    After an accident at the Grand Rapids distribution facility, the fire suppression system was reconfigured to restore compliance while operations continued.

Questions about warehouse renovations

Can you renovate a warehouse while it keeps shipping?

Yes. Work is phased by area, separated from forklift traffic, and scheduled around shifts and peak days. Tasks that need a dock or aisle closed are planned with you in advance.

Do we need a permit to raise our racking?

Often, because the fire protection may need to change. Requirements vary by municipality and by what is stored. Have the change reviewed before the racks are ordered.

Can you build offices inside a high-bay warehouse?

Yes, as enclosed rooms with their own ceiling, lighting and heating and cooling. The new ceiling changes sprinkler coverage, and we sort that out with the fire protection designer during planning.

Who decides if our sprinklers need to change?

A licensed fire protection designer reviews the change against the code and your insurer's requirements. The fire marshal and building department make the final call.

Can the shipping yard concrete be replaced without closing the yard?

Yes, in sections. Trucks are routed around each section, and every pour gets its own reopening date based on the mix and the weather.

Can you replace the roof over our racking?

Yes. The roof is opened only as far as can be closed up before the crew leaves, and the work over each area is planned with your operations team.

Planning warehouse renovations?

Send the short form or call. The first conversation and site review are free. Call 616-323-0292 or email info@grandrapidsconstruction.com.

Request a quote
CallGet a quote