Planning guides for commercial building owners and managers
Written for the West Michigan owner or facility manager who has to get a project approved or a damaged building back in service. Free to read, nothing to sign up for, and each one ends with a worksheet you can print.

- MI Builders License 262100253
- Commercial and industrial work only
- Work planned around operating facilities
- Kent, Barry and Muskegon counties
How to plan renovations around production
Decide what cannot stop before you decide what gets built. Map production and access constraints, list every task that needs a shutdown, split responsibilities between your equipment vendor and the building contractor, and agree who signs off before each area goes back into service.
- Worksheet
- Shutdown and constraint planning sheet
- Goes with
- Industrial and manufacturing
What to do after commercial building damage
Get people safe and call 911 if there is any immediate danger. Keep everyone out of the damaged area, record what happened from a safe distance, notify your insurer, and call a commercial contractor to stabilize the building. Do not attempt structural, electrical or gas repairs yourself.
- Worksheet
- Incident record
- Goes with
- Emergency repairs
Commercial insurance claim readiness guide
A commercial property claim is a construction project with four parties: you, your insurer, the authorities and the contractor. Claims go smoother when the damage is documented before it changes, emergency work is kept separate from the permanent repair, and one written scope is shared by everyone.
- Worksheet
- Claim file checklist
- Goes with
- Restoration and insurance repairs
How to compare commercial construction proposals
Compare scope before price. Line the proposals up item by item and mark each one included, excluded, an allowance or unclear. The gaps you find, not the totals, tell you which proposal really costs less.
- Worksheet
- Proposal comparison sheet
- Goes with
- Renovations and buildouts
What to verify before developing a commercial site
Before you set a budget, confirm in writing that the use is allowed, that the site can be reached and served by utilities with enough capacity, what the soil and stormwater will require, and who is responsible for each piece of design. Treat everything else as an assumption with a price attached.
- Worksheet
- Feasibility register
- Goes with
- Development and new construction
Planning commercial construction around a West Michigan winter
Winter doesn't stop commercial work in West Michigan, but it changes what makes sense to schedule. Interior renovations run well all year; concrete, roofing and sitework need protection, heat or a later date; and spring frost laws limit heavy deliveries on many roads. Decide in the fall which work goes where, and give winter costs their own budget line.
- Worksheet
- Season planning sheet
- Goes with
- Concrete and exterior
How to use these
Read the one that matches your situation, fill in what you can of the worksheet, and bring it to the first meeting with any contractor. A half-filled worksheet still saves an hour of questions and makes proposals easier to compare.
These guides are general planning help. They are not engineering, legal or insurance advice, and each one says where a licensed professional or the local authority has to take over.