Industrial and manufacturing facility construction in Grand Rapids
Grand Rapids Construction renovates and improves operating plants, shops and production buildings across West Michigan. We plan the work around your production schedule, coordinate the trades, and handle permits and inspections, so your team keeps running the plant.

- MI Builders License 262100253
- Commercial and industrial work only
- Work planned around operating facilities
- Kent, Barry and Muskegon counties
What we handle
- Plant and shop floor renovations
- Concrete pads and foundations for equipment and HVAC units
- Wall removal, new partitions and room changes
- Break rooms, locker rooms and restrooms for crews
- Plant offices, conference rooms and quality labs
- Dock, door and opening changes
- Draft curtains and fire sprinkler changes after a layout change
- Roof, wall and floor repairs in production areas
Where our part stops. We manage the construction and coordinate the licensed trades and designers the work needs. We do not install or commission production equipment, and we do not promise uninterrupted production: we plan the interruptions with you.
Specific jobs we handle
The jobs clients most often call us for under this service, each with its own page.
- Warehouse renovationsOffices, docks, yards, racking changes and roofs over operations
- Equipment pads and foundationsConcrete for production machines, HVAC units and compressors
- Break rooms and locker roomsCrew facilities in plants, shops and warehouses
- Not listed here?Describe the job and we will tell you if it fits
Planning around production
The first conversation is about your operation, not our schedule. Which lines run on which shifts, where forklifts travel, which areas can be closed and for how long, and what cannot stop at all. From that we lay out work zones, delivery routes and the order of the work.
Some tasks can be phased around a running line. Others, such as tying into a utility or pouring next to a machine, need a planned shutdown. We name those early so the outage lands on a weekend, a changeover or a holiday week instead of surprising anyone.
Equipment and building interfaces
New equipment usually arrives with requirements for its foundation, power, air, drainage and clearances. Your equipment vendor owns the machine; we build what the building has to provide for it. We ask for the vendor's drawings and cut sheets up front and sort out who is responsible for each connection before the equipment ships.
For Leitz Tooling Systems in Grand Rapids, that meant removing existing wall systems and placing new concrete pads for a high-capacity HVAC unit while protecting the specialized equipment around the work.
Dust, noise and separation
Inside an active building we separate the work from your people and product: temporary walls or plastic containment, filtered ventilation where dust is a concern, marked pedestrian routes and agreed hours for loud work. In food, medical-device or clean production, your quality and safety team reviews the plan before we start.
Design and permit coordination
Structural changes, new loads on a slab, changes to exits and changes to fire protection usually need drawings sealed by a licensed engineer or architect, and a permit. We coordinate those professionals, submit to the building department and schedule the inspections. Requirements depend on the municipality and the scope, so we confirm them for your building instead of assuming.
What helps us review your project
- Drawings of the area, even old or partial ones
- Photos of the area and the route to it
- Equipment drawings or cut sheets, if equipment is involved
- Shift schedule and any planned shutdown dates
- Site safety rules and contractor requirements
- Who approves the work and by when you need it done
Planning guide: How to plan renovations around production
Projects like this
Work we have done for named West Michigan clients. All projects and client reviews.

Wall removal and HVAC equipment pads for Leitz Tooling Systems
Facility changes to support an operational upgrade: existing wall systems removed and new concrete pads placed for a high-capacity HVAC unit.

Break room renovation at SUR-SEAL's new manufacturing facility
An outdated industrial space turned into a bright employee break room after SUR-SEAL acquired its Grand Rapids facility.
Restroom renovations and fire protection support for Motus Integrated Technologies
Restroom renovations at a high-volume production facility, with support on draft curtain and fire suppression work.
"Grand Rapids Construction completed bathroom renovations for Motus Integrated Technologies and provided valuable support with draft curtain and fire suppression work."
Questions about industrial and manufacturing
Can you work while the plant is running?
Yes, most of our industrial work is in operating facilities. Work is phased, separated from production with barriers or containment, and scheduled around shifts. Tasks that need a line or utility shut down are identified during planning so you can pick the window.
Who is responsible for the equipment foundation design?
The equipment manufacturer supplies the loads and anchor requirements. A licensed engineer designs the foundation when the load or the slab condition calls for it. We coordinate both and build it.
Do you follow our site safety program?
Yes. Tell us your contractor requirements (orientation, PPE, hot-work permits, lockout rules, badging) and we build them into the plan. We can provide a certificate of insurance and license information on request.
How early should we call?
Before the budget is set, if you can. An early walk-through finds the items that change cost and schedule, such as a slab that cannot take the load or a sprinkler change triggered by a new wall, while they are still cheap to plan for.
How do you help clients secure internal, CAPEX, or board approval?
Many projects stall at approval because of uncertainty. We help by describing the scope in business terms, setting realistic budget ranges and timelines, naming risks, assumptions and tradeoffs early, and preparing you for the questions your finance team or board will ask. The goal is to remove enough uncertainty for a confident decision.
Can you coordinate multiple trades and moving parts without slowing the job down?
Yes. We coordinate materials, scheduling, and trade partners to keep work organized and on track. Our team is structured to manage real-world facility conditions and keep projects moving efficiently. Emergency and commercial repairs often require multiple trades. Poor coordination causes delays, rework, and added disruption.
Related services
Projects rarely stay inside one trade. These are the scopes most often combined with this one. All services.
- Concrete and exteriorSlabs, equipment pads, shipping yards, windows and siding
- Fire suppression and life safetySprinkler changes, alarms, emergency lighting, draft curtains
- Renovations and buildoutsOffices, retail, restrooms and tenant improvements
- How a project runsEight phases from first walk-through to closeout
Planning work like this?
Send the short form or call. The first conversation and site review are free. Call 616-323-0292 or email info@grandrapidsconstruction.com.