Medical and dental office construction in Grand Rapids
Buildouts and renovations for dental practices, medical offices and clinics in West Michigan. These spaces pack a lot of plumbing, power and equipment into small rooms, and the work has to respect patients and staff when the practice stays open.

- MI Builders License 262100253
- Commercial and industrial work only
- Work planned around operating facilities
- Kent, Barry and Muskegon counties
What we handle
- New practice buildouts in shell or second-generation space
- Treatment room and operatory additions
- Reception, waiting room and front desk remodels
- Sterilization areas, labs and staff rooms
- Plumbing, power and data for clinical equipment
- Accessible restrooms and routes
- Ceilings, flooring and cleanable wall finishes
- After-hours and phased work in open clinics
Where our part stops. We build to drawings by licensed designers and coordinate your equipment supplier. We do not certify clinical compliance; your practice and its consultants own those requirements.
Start with the equipment list
Chairs, imaging, sterilizers, compressors and vacuum systems each need specific plumbing, power, blocking in the walls and clearances. The layout follows the equipment, so we ask for your supplier's drawings and cut sheets before walls are framed. The supplier installs the equipment; we build the room to receive it and coordinate the dates.
Rooms with X-ray equipment may need shielding designed by a qualified specialist. That requirement comes from the equipment and the regulations, and we coordinate it instead of guessing.
Renovating while you see patients
In an open clinic we separate the work with sealed barriers, keep dust out of clinical areas, and schedule noisy work outside appointment hours. Your infection-control lead reviews the plan, because what is acceptable differs between a dental office and a surgical suite.
Opening day depends on inspections
A practice cannot open until the building, electrical, plumbing and mechanical inspections are passed and, for a new use, the certificate of occupancy is issued. We schedule those backwards from your opening date and tell you early if the date is at risk.
What helps us review your project
- A floor plan of the space
- Your equipment list and supplier contact
- Lease dates and the landlord's work letter, if any
- The number of treatment rooms you need now and later
- Target opening date
- Any designer or architect you already work with
Planning guide: How to compare commercial construction proposals
Projects like this
Work we have done for named West Michigan clients. All projects and client reviews.

Office buildouts and restroom renovations for Caliber Collision
Interior office buildouts and restroom renovations at two Caliber Collision locations, coordinated with the shops' operations teams.
"Grand Rapids Construction recently completed interior office build-outs and bathroom renovations for our Caliber Collision locations in Grand Rapids and Kalamazoo."

Every restroom renovated over one summer break at New Branches Charter Academy
A full renovation of all the school's restrooms, including the aging plumbing below them, finished before students returned.
"Our bathrooms were in need of a full remodel, and the aging plumbing system required a complete overhaul."
Questions about medical and dental
Have you built dental offices before?
Yes. Our work includes drywall hanging and finishing and interior buildout for dental offices in the Grand Rapids area.
Can the work be done at night or on weekends?
Yes. For open practices, disruptive work is commonly scheduled outside patient hours.
Who orders the dental or medical equipment?
You do, through your supplier. We coordinate rough-in dimensions, delivery and installation dates with them.
Do you work with our architect?
Yes. We build to your architect's drawings, or coordinate licensed design professionals if you do not have one yet.
Related services
Projects rarely stay inside one trade. These are the scopes most often combined with this one. All services.
- Renovations and buildoutsOffices, retail, restrooms and tenant improvements
- Fire suppression and life safetySprinkler changes, alarms, emergency lighting, draft curtains
- Development and new constructionFeasibility, preconstruction, additions and new buildings
- How a project runsEight phases from first walk-through to closeout
Planning work like this?
Send the short form or call. The first conversation and site review are free. Call 616-323-0292 or email info@grandrapidsconstruction.com.