Equipment pads and foundations in Grand Rapids
New equipment arrives with a list of what it needs from the building: a level base that can carry its weight, anchors in the right places, room around it and connections to power, air and drainage. Grand Rapids Construction builds the pads and foundations, cuts and replaces slab in operating plants, and coordinates the engineer, the vendor and the trades so the base is ready when the equipment ships.

- MI Builders License 262100253
- Commercial and industrial work only
- Work planned around operating facilities
- Kent, Barry and Muskegon counties
Who pours concrete pads for new equipment or an HVAC unit in a Grand Rapids plant?
A commercial contractor builds equipment pads and foundations to the equipment vendor's loads and anchor requirements, with a licensed engineer designing the foundation when the load or the existing slab calls for it. Grand Rapids Construction builds pads for production equipment, HVAC units and compressors in Grand Rapids and West Michigan, including cutting into the floor of a running plant. Send the vendor's foundation drawing or cut sheet and photos of where the equipment will sit.
What this covers
- Pads for production machines and presses
- Exterior pads for HVAC units and chillers
- Compressor and generator pads
- Saw cutting and removal of existing slab
- Deeper foundations where the engineer requires them
- Anchor bolts and embeds set to the vendor's template
- Trenches and sleeves for power, air and drainage
- Floor patching and sealing around new equipment
Where our part stops. We build the pad or foundation and coordinate the engineer and trades. We do not design foundations for heavy or vibrating equipment ourselves, and we do not set, connect or commission the equipment; the vendor or your rigger does.
Start with the vendor's requirements
The equipment manufacturer knows the machine: its weight, how the load is spread, whether it vibrates or shocks the floor, where the anchors go and how level the base must be. That information is in the foundation drawing or installation manual. We ask for it before pricing, because a pad drawn from a guess has to be redone when the real drawing arrives.
We also ask who sets the equipment, who sets the anchors and who makes each connection. Writing that down early avoids a pad that is finished, cured and in the wrong place for the conduit.
When an engineer designs the foundation
Light equipment on a sound slab may need nothing more than a pad built to the vendor's details. Heavy, vibrating or tall equipment, a slab that is thin or cracked, or soil that is soft or wet all change that. A licensed engineer then designs the foundation: its size, depth, reinforcing and anchors. We coordinate the engineer, gather what they need to know about the existing slab and soil, and build to the sealed design.
Cutting into a running plant's floor
Placing a foundation inside an operating building means saw cutting, breaking out and hauling concrete next to people and machines. The work area is barricaded, dust and slurry from cutting are controlled, and the floor is checked for buried conduit and piping before the saw goes in. Loud work and concrete deliveries are scheduled around shifts.
New concrete needs time to gain strength before it carries equipment, and that time depends on the mix, the thickness and the temperature. The date the equipment can be set is planned for the specific pour, not assumed.
HVAC pads at Leitz Tooling Systems
For Leitz Tooling Systems in Grand Rapids, the work included removing existing wall systems and placing new concrete pads for a high-capacity HVAC unit. Specialized tooling equipment stayed in place next to the work, so protecting it was part of the plan from the start.
What helps us help you
- The vendor's foundation drawing or installation manual
- Equipment weight and footprint, if there is no drawing yet
- Photos of the floor or ground where it will sit
- Any drawings of the existing slab or building
- The date the equipment ships and who will set it
- Shift schedule and hours the area can be closed
Part of our industrial and manufacturing work.
Related projects
Work for named West Michigan clients. All projects and client reviews.
Wall removal and HVAC equipment pads for Leitz Tooling Systems
Facility changes to support an operational upgrade: existing wall systems removed and new concrete pads placed for a high-capacity HVAC unit.
Questions about equipment pads and foundations
Can our existing floor hold the new machine?
Sometimes. It depends on the slab thickness, its condition, the soil below and the load. If there is any doubt, a licensed engineer evaluates it before the equipment is ordered.
How long after the pour can the equipment be set?
It depends on the mix, the thickness and the temperature. We set a date for your specific pour, and faster-curing mixes are an option when the schedule is tight.
Who sets the anchor bolts?
Usually we set them in the pour to the vendor's template. Some vendors prefer drilled anchors after the equipment is placed. We agree which before the pour.
Can an HVAC unit go on a pad instead of the roof?
Often it can, if there is room on the ground and the ductwork can reach it. Your mechanical contractor and engineer decide, and we build the pad.
Can you work next to running equipment?
Yes. The area is barricaded, nearby machines are covered and protected, dust is controlled, and loud work is scheduled with your production team.
What does an equipment pad need besides concrete?
Often sleeves or trenches for power and air, a drain or containment for equipment that can leak oil or water, bollards where forklifts pass, and the service clearances the vendor requires.
Related work
Part of industrial and manufacturing. All services.
- Warehouse renovationsOffices, docks, yards, racking changes and roofs over operations
- Forklift damage repairWalls, columns, doors and piping hit inside a plant or warehouse
- Shipping yard concreteTruck courts and dock aprons replaced while trucks keep moving
- Industrial and manufacturingPlant renovations, equipment pads, work around production
Planning equipment pads and foundations?
Send the short form or call. The first conversation and site review are free. Call 616-323-0292 or email info@grandrapidsconstruction.com.