Built on WIX Headless
Commercial and industrial general contractor, Grand Rapids, MI. MI Builders License 262100253Emergency repairsVendor setup

School renovations in Grand Rapids, built over the break

A school has one fixed date: the day students come back. Grand Rapids Construction renovates restrooms, classrooms, offices and building systems in schools during summer break and other closures, with the planning done in the winter and spring so the summer is spent building.

Call 616-323-0292info@grandrapidsconstruction.com

Request a free quote

Commercial and industrial projects only. A few details are enough to start.

Rather talk? Call 616-323-0292 or email info@grandrapidsconstruction.com. For project requests only; sales, marketing and SEO offers aren't answered.

New Branches Charter Academy sign in front of the school building
New Branches Charter Academy, Grand Rapids
  • MI Builders License 262100253
  • Commercial and industrial work only
  • Work planned around operating facilities
  • Kent, Barry and Muskegon counties

Who can renovate our school over summer break in Grand Rapids?

A commercial general contractor that plans the work backwards from the first day of school, orders long-lead items early and runs the trades in the weeks the building is empty. Grand Rapids Construction renovates schools in Grand Rapids and West Michigan, and renovated every restroom at New Branches Charter Academy over one summer break. The first step is a walk-through well before school lets out, while there is still time to order materials.

What this covers

  • Restroom renovations, including plumbing below the floor
  • Classroom, office and corridor renovations
  • Flooring, ceilings, paint and lighting
  • Doors, hardware and secure entries
  • Plumbing, electrical and HVAC work through licensed trades
  • Excavation to reach failing underground lines
  • Hazardous materials testing coordinated before demolition
  • Phased work over several breaks for larger programs

Where our part stops. We plan and build the renovation and coordinate licensed trades, designers and abatement contractors. We do not set your school's purchasing or bidding rules, and the building department decides what the code requires.

Plan backwards from the first day of school

The schedule starts at the end. Teachers need their rooms back before students arrive, the building needs its final inspections and cleaning before that, and the trades need their finish time before that. Counting back from the first day shows how many weeks are really left for demolition and rough-in, and it is usually fewer than people expect.

That is why the decisions happen in winter and spring: the scope, the drawings, the permit, board or management approval and the contract. A project still being designed when school lets out is already behind.

Order long-lead items before school lets out

Some materials take longer to arrive than the summer lasts. Plumbing fixtures, toilet partitions, doors and hardware, light fixtures, rooftop equipment and electrical gear are the usual ones. We identify them early, get selections approved, and place orders so the material is on site when the crew needs it instead of holding up the last weeks.

If an item cannot arrive in time, we say so in the spring and offer an alternative, or a plan to install it during a later break.

Older buildings hide things

Many school buildings are decades old. Drains under the floor may be failing, walls may hide undocumented piping, and some materials, such as old floor tile, mastic or pipe insulation, may contain asbestos. Testing is done before demolition, and any abatement is done by a licensed abatement contractor before our crews start.

At New Branches Charter Academy, a K-8 school in Grand Rapids, the aging plumbing under the restrooms needed a complete overhaul. The work included excavation to reach the lines, cured-in-place pipe lining, new tile floors and walls, new fixtures and toilets, and updated electrical, finished before students returned. The school's facility manager noted that the project stayed on schedule despite the challenges found along the way.

Working in a school that is not quite empty

Summer buildings still have people in them: office staff, custodians, summer programs and deliveries. We agree on access routes, keep work areas closed off, and follow the school's rules for contractors on site, including sign-in and any background check requirements the school sets.

What helps us help you

  • The date staff and students return
  • The spaces you want renovated, in priority order
  • Floor plans or old drawings of the building
  • Any reports on plumbing, roofing or hazardous materials
  • Your purchasing or bidding rules, if any apply
  • Summer programs or staff who will be in the building

Part of our renovations and buildouts work.

Related projects

Work for named West Michigan clients. All projects and client reviews.

  • K-8 school, Grand Rapids, MI

    Every restroom renovated over one summer break at New Branches Charter Academy

    A full renovation of all the school's restrooms, including the aging plumbing below them, finished before students returned.

    "Our bathrooms were in need of a full remodel, and the aging plumbing system required a complete overhaul."

    Miroslav M., Facility Manager, New Branches Charter Academy

Questions about school renovations

When should we start planning a summer project?

In the winter or early spring. Design, permits, approvals and long-lead materials all need to be settled before the last day of school so the break is spent building.

What if the work is too big for one summer?

We split it into phases over several breaks, with each phase leaving the building fully usable when students return.

Can you work during winter or spring break?

Yes, for work that fits the window: a small restroom, flooring, painting or a single system. Anything that cannot be finished and inspected before the building reopens moves to a longer break.

Do you work with public school bidding rules?

Yes. Public and charter schools often have purchasing rules. Your business office knows what applies, and we provide pricing and documents in the form those rules require.

Does a school restroom renovation need a permit?

Usually. Plumbing, electrical and layout changes normally need permits and inspections. The building department decides, and we handle the submissions.

What happens if we find a problem halfway through the summer?

Work on that item stops, the condition is photographed and priced, and the person you name approves the fix. We show what it does to the schedule before you decide.

Planning school renovations?

Send the short form or call. The first conversation and site review are free. Call 616-323-0292 or email info@grandrapidsconstruction.com.

Request a quote
CallGet a quote